What Is Vacuum?

The vacuum (low pressure) test is a test in which it is verified that equipment maintains its function at the low absolute pressure corresponding to flight altitude or the space environment, and retains its structural integrity under the pressure differential.

Purpose of Vacuum

The purpose is to verify that the equipment continues to operate under cabin depressurisation or high-altitude conditions, and that gaskets, covers and sealing elements withstand the pressure differential.

Which Products Is Vacuum Applied To?

  • Aerospace avionics units
  • Spacecraft components
  • Pressurised enclosures
  • Electronics operating at high altitude

In Which Sectors Is Vacuum Used?

AerospaceSpaceDefenceElectronics

Standards Related to Vacuum

  • RTCA DO-160 Section 4
  • MIL-STD-810 Method 500
  • ECSS-E-ST-10-03

Vacuum Conditions

Pressure
Absolute pressure defined according to the category; given as an altitude equivalent
Rate of pressure change
Defined in the standard; a rapid decompression test may also be performed
Temperature
Defined in the standard; may be applied combined with temperature
Function
Operation and monitoring under pressure

Equipment for Vacuum

  • Vacuum chamber
  • Absolute-pressure measurement system
  • Pressure control and logging rig
  • Function-monitoring equipment

Sample Requirements for Vacuum

  • The specimen must be in flight configuration
  • Sealing elements must be in place
  • Function-monitoring connections must be vacuum feedthroughs
  • The number of samples is defined in the program

Duration of Vacuum

From a few hours to a few days, depending on pressure steps and function checks.

Vacuum Procedure

  1. 1The specimen is set up in the chamber and monitoring is connected.
  2. 2The target absolute pressure is reached at the defined rate.
  3. 3It is held under pressure and function is checked.
  4. 4Rapid decompression is applied if required.
  5. 5Pressure is returned to normal.
  6. 6Function and visual inspection are repeated.

Vacuum Acceptance Criteria

The acceptance criterion is defined in the programme: continuity of function at low pressure, and the absence of leakage or permanent deformation.

Evaluation of Results

The risk of electrical discharge (corona) increases at low pressure; it is assessed separately for units carrying high voltage.

Vacuum Report

  • Applied standard and category
  • Target pressure and rate of change
  • Temperature condition
  • Function results
  • Visual-inspection findings

Accreditation

EUROLAB holds internationally recognised accreditation obtained from accreditation bodies party to the IAF and ILAC multilateral recognition arrangements, under ISO/IEC 17025 for laboratory testing, ISO/IEC 17020 for inspection and surveillance, and ISO/IEC 17021-1 and ISO/IEC 17065 for system and product certification. This chain ensures the reports and certificates issued are accepted worldwide.

Whether this test can be offered within accredited scope depends on your product and the standard applied; since accreditation is method-based, the scope is confirmed in writing at the quotation stage.

Scope and authorisations

Related Regulations

  • Aerospace equipment qualification specifications

Aerospace Testing — What Does This Testing Field Cover?

The section below describes the field that the Vacuum test belongs to; the conditions and acceptance criteria of this particular test are given in the sections above. The scope specific to your product is confirmed in writing at the quotation stage.

Aerospace testing shows that equipment keeps working in the flight environment and provides evidence for the airworthiness file. In this family the acceptable probability of failure is several orders of magnitude lower than in other sectors; this directly determines the scope of testing and the certification burden.

The most distinctive feature of the field is TRACEABILITY. Which melt an aircraft part came from, in which heat treatment furnace and with which cycle it was processed, which operator made the weld and which inspector approved it are all recorded. The test report is one link in this chain; if the chain is broken, the report carries no value on its own.

Environmental qualification runs through RTCA DO-160, with categories selected according to the equipment's MOUNTING LOCATION in the aircraft. A device mounted on the cockpit panel and one mounted inside the wing pass the same section under different categories. When reading a DO-160 report it is therefore essential to know which sections were applied at which categories.

On the software and complex hardware side the approach changes entirely: the evidence is not testing but PROCESS ASSURANCE. DO-178C for software and DO-254 for complex electronic hardware define how the development process is to be run and which evidence is to be produced. Every step, from requirement to code, from testing of the code to coverage analysis, must be traceable. Testing software does not make it certifiable; the process record does.

A separate body of work applies on the material and special process side. AWS D17.1 is used for welding, SAE AMS 2750 for pyrometry in heat treatment and NAS 410 for non-destructive testing personnel. For special processes (heat treatment, coating, welding, NDT, bonding) NADCAP accreditation is effectively mandatory in the supply chain; without NADCAP it is not possible to sell parts to many OEMs.

On the quality system side the AS/EN 9100 series is used: 9100 for manufacturers, 9110 for maintenance organisations and 9120 for distributors. Without these certificates it is practically impossible to enter the aerospace supply chain, and audits are markedly more detailed than in other sectors.

Counterfeit part risk is a subject peculiar to the field. Separate standards and verification methods (visual inspection, X-ray, decapsulation and internal structure examination, XRF) are used to detect counterfeit or reworked parts in the electronic component supply chain.

Space applications add further layers: outgassing in vacuum, radiation tolerance, long-duration thermal vacuum cycling and assessment of single event effects.

Method groups in this field

  • Environmental qualification

    RTCA DO-160 sections: temperature and altitude, vibration, shock, humidity, sand and dust, fungus, salt fog, fluid susceptibility, icing, lightning.

  • Electromagnetic

    The EMC sections of DO-160; MIL-STD-461 and MIL-STD-704 power characteristics on military platforms.

  • Software and hardware assurance

    DO-178C software life cycle and DO-254 hardware design assurance evidence; requirement traceability and coverage analysis.

  • Materials and welding

    Welding qualification under AWS D17.1, mechanical testing of materials, metallography and non-destructive examination.

  • Special process control

    SAE AMS 2750 pyrometry, coating and heat treatment process verification, preparation for NADCAP audits.

  • Space environment

    Thermal vacuum cycling, outgassing, radiation tolerance and acoustic/vibration qualification.

Commonly confused in this field

  • There is no such document as a "DO-160 certificate"; DO-160 is a test specification and its output is a qualification report.
  • The selection of sections and categories comes from the customer's equipment specification; the laboratory cannot make that selection on its own.
  • DO-178C and DO-254 cannot be satisfied by testing; the evidence is the traceability of the development process.
  • An AS9100 certificate is not a product approval; it is a quality system certificate and part approval runs separately.
  • For special processes, work carried out without NADCAP is not accepted in the supply chain even when it is technically correct.
  • MIL-STD-810 and DO-160 are often confused: one is a military and the other a civil aviation specification, and their profiles differ.

Which decisions these results support

  • Airworthiness and TSO/ETSO files
  • Entry into the aerospace supply chain and supplier approval
  • Special process approval and NADCAP preparation
  • Determining the impact of a design change on qualification
  • Managing counterfeit part risk and component verification

Related Tests

Frequently Asked Questions About Vacuum

According to which standard is Vacuum made?

Vacuum is executed in scope RTCA DO-160 Section 4, MIL-STD-810 Method 500 and ECSS-E-ST-10-03. The limit values ​​and acceptance criteria to be applied are defined in the product standard; The version valid for your product is confirmed in writing at the offer stage.

Which products does Vacuum apply to?

Mainly applied to Aerospace avionics units, Spacecraft components, Pressurised enclosures and Electronics operating at high altitude. Whether your product is included in the scope is determined by examining its technical specifications and intended use.

Under what conditions is Vacuum done?

The determining parameters are: Pressure — Absolute pressure defined according to the category; given as an altitude equivalent, Rate of pressure change — Defined in the standard; a rapid decompression test may also be performed and Temperature — Defined in the standard; may be applied combined with temperature. The full terms are in the "Test Conditions" section on the page and vary depending on the product standard.

What kind of sample is needed for Vacuum?

The specimen must be in flight configuration, Sealing elements must be in place and Function-monitoring connections must be vacuum feedthroughs. The number of samples is determined according to the product standard and the scope to be reported.

How long does Vacuum take?

From a few hours to a few days, depending on pressure steps and function checks. This duration belongs to the experiment itself; sample preparation, queuing and reporting are also evaluated. A realistic schedule for your product is given in the offer.

What is the Vacuum result called "appropriate"?

The acceptance criterion is defined in the programme: continuity of function at low pressure, and the absence of leakage or permanent deformation.